Bespoke 1700 Ton Potato Store in Lincolnshire

We worked closely with one of our longstanding customers right from the concept of this new crop storage area. Advising on the store dimensions, and arranging the installation of the insulated panel works, ensuring the build kept on budget and on time. Careful considerations were made, to keep noise pollution from compressors away from residential properties. To overcome this a challenging 50 meter pipe run, was incorporated into the design, complete with split control panels. As ever, energy efficiency and high quality were the foundations of our installation, with all equipment designed and built within the UK. Our dedicated installation team, ensuring there 30 of experience shines through on every aspect or the work. We complimented the system, with the latest energy saving devices, Co2 Flush fan ventilation system, and multi probe wireless temperature monitoring. All completed within a four month time frame from concept to commissioning.